Sunday, 26 October 2014

Building Site for upper carpark, Concrete staircases still to be added to building levels

Acro props made from 3mm stainless steel tube and 2.5mm stainless steel threaded bar, what would we do without eBay?

Building floors and supports made from aluminium, so the whole structure should be able to be left outside



Wednesday, 1 October 2014

Additional track rail added to bridge, level crossing


Tuesday, 30 September 2014

Level crossing barrier construction using heat shrink tubes

 
Top section finished, really pleased, you would think you were walking in the Swiss Alps


Monday, 29 September 2014

Railway bridge installed. Construction - 6mm Aluminium sheet, 
ABS 'I' beam section and welding rod






Monday, 22 September 2014

Wednesday, 17 September 2014