Sunday, 7 September 2014


Water course for the mountain section of the railway, fast flowing stream, waterfall and bridges. Waiting for stone to landscape

 

 


Sunday, 31 August 2014

Marklin 55332 KOF111 DB Gog railway conversion to engage on LGB rack.

Cog 21.5mm diameter 18 teeth





Wednesday, 20 August 2014

Groundwork preparation for phase 2. 

The duel line will split into two single tracks, one circumnavigating the pond, the second cutting inland through two tunnels, Scenery will consist of lake, ravine with fast flowing stream, 2 waterfalls, 3 bridges, 2 tunnels and rock based mountain scenery.





Wednesday, 6 August 2014

Remodelled Sea Container trailer to transport Marklin containers pulled by Siku Control Scania