Marklin 55332 KOF111 DB Gog railway conversion to engage on LGB rack.
Cog 21.5mm diameter 18 teeth
Wednesday, 20 August 2014
Groundwork preparation for phase 2.
The duel line will split into two single tracks, one circumnavigating the pond, the second cutting inland through two tunnels, Scenery will consist of lake, ravine with fast flowing stream, 2 waterfalls, 3 bridges, 2 tunnels and rock based mountain scenery.
Saturday, 16 August 2014
Crash barrier construction
Wednesday, 13 August 2014
Wanderweg
Wednesday, 6 August 2014
Remodelled Sea Container trailer to transport Marklin containers pulled by Siku Control Scania