Wednesday, 11 December 2013
Sunday, 17 November 2013
Friday, 23 August 2013
The first thing I'm making is a 3.5mt long steel bridge to carry twin tracks and span the small horseshoe bay, (pond photo, top right).
Fabricated from 'L' section and flat MS bar, painted with smooth Hammerite silver paint and held together by 2mm stainless steel nuts and bolts, over 1000 of them, a true labour of love!!
Fabricated from 'L' section and flat MS bar, painted with smooth Hammerite silver paint and held together by 2mm stainless steel nuts and bolts, over 1000 of them, a true labour of love!!
Subscribe to:
Posts (Atom)